Flee Wee and Mary Jane


My Favorite Toilet
A few weeks ago my neighbor who I thought was a toilet expert told me I should get this toilet:

So I ordered one on ebay.
Then it arrived in 100 pieces via UPS.
So they refunded my money and I did a little more research and decided to get this toilet:

Then I changed my mind and ordered this toilet which is clearly the best toilet:

Dry Wall has Started
Here is everything in my garage:

Here is the false wall in the hallway:

Things to do before the drywall
A bunch of stuff needed to get done before the drywall could go in.

The Club Wizz Panasonic fan

Testing out the recessed computer controlled LED lights that cycle through 64,000 colors.

Bathtub faucet decisions
Poor Flee Wee
Fell in a big puddle at Point Isabel


Hurray for References!
Contractors checked out so they start Wednesday.
New Contractors
So now that Trey is gone, we need to find some people to replace him. This is totally hard and it sucks since Trey was so fabulous.
Anyway, I’ve been looking on Craigslist again and found this guy. He seems like he knows what he is doing so as long as his references pan out he and his partner will be the new Club Fizz VIPs.
Since he has 2 eyebrow piercings and his partner was wearing a shirt with the Pillsbury Doughboy on it I am really hoping this works out.
Club Wizz tub has arrived
The giant Bain Ultra Thalassa Sensation was delivered today by a giant truck.

Club Fizz has a bar
I know it’s a little early to be getting furniture as Club Fizz still doesn’t have a floor, but I’ve been looking at what’s out there in the way of space-age bars anyway.
I couldn’t resist this one on Craigslist



It retails for $2600
It was listed for $1000
Then the price came down to $700
I offered $500
He said $800 with heinous stools
I said $500 no heinous stools
He said ok
So now its in storage waiting for the grand opening.
We failed the ‘lectrical ’spection AGAIN
So we had another City inspection today. The inspector decided to mess with us and is requiring that we replace some wire with another type of wire even though what we have is totally up to code.
Anyway, we’re delayed and Figgie has to come back and replace a bunch of stuff. Luckily, everything else passed and we can move forward with the insulation & sheet rock.